Table of Contents
Approved
Over the past week, some of our users have reported encountering the Oracle job error log.
Show Location History
v$session.dba_scheduler_running_chains.dba_scheduler_running_jobs.v$scheduler_running_jobs.dba_scheduler_job_run_details.
The job includes log views *_SCHEDULER_JOB_LOG
and *_SCHEDULER_JOB_RUN_DETAILS
from the data book, where:
* matches ALL
See “View task log”.
Requesting personal information in additional dictionary views
Query views such as DBA_SCHEDULER_RUNNING_JOBS
and DBA_SCHEDULER_RUNNING_CHAINS
to see specific status and detailsInformation about current features and quest chains.
>
Create applications that receive health events from the scheduler
Open Event Viewer and navigate to Applications and Services Logs/Microsoft or Windows/TaskScheduler/Optional to view all task histories.
See “Monitoring the status of a task using events fired by the scheduler”
Set up tasks to send email notifications when status changes
See “Track job status with email notifications”
Show Log Of Each Task
You can usually find information about task execution, task status changes, and task failures in the task log. The job log reflects the results of local and remote jobs. The job log is used as the following two views of the data glossary:
*_SCHEDULER_JOB_LOG
*_SCHEDULER_JOB_RUN_DETAILS
Depending on the current log level, the scheduler can create entries in the job log whenever the last job is present and run it when it is created, deleted, activated, etc. Thus, since task a has a recurring schedule, the scheduler createst multiple entries in the procedure log, one for each instance of the task. Each journal contains entry information specific to a particular new run, such as the completion status of a job posting.
The following example shows the accounting log entries for a recurring function whose value is considered for the max_runs
attribute:
SELECT job_name, job_class, operation, status FROM USER_SCHEDULER_JOB_LOG;JOB_NAME JOB_CLASS JOB STATUS----------- ------ -------------- - ---- ------TASK 1 CLASS 1 SUCCESSTASK 1 CLASS 1 SUCCESSTASK 1 CLASS 1 SUCCESSTASK 1 CLASS 1 SUCCESSASSIGNMENT 1 GRADE 1 COMPLETED
You can control how often information is logged to the task log by setting the logging_level
attribute of the task or training session, if any. Table 29-11 shows the possible logging_level
.
values to achieve.
Approved
The ASR Pro repair tool is the solution for a Windows PC that's running slowly, has registry issues, or is infected with malware. This powerful and easy-to-use tool can quickly diagnose and fix your PC, increasing performance, optimizing memory, and improving security in the process. Don't suffer from a sluggish computer any longer - try ASR Pro today!
A log of the entries that a task will run is created only after the task succeeds, fails, or completes.
In the following example,The actual workbook entries for the entire job life cycle are shown. In this case, the logging level for the job class is typically LOGGING_FULL
and the job is a solid, non-repeating job. However, after the first boost run, the job is released and executed again. It will then be stopped and removed.
SELECT to_char(log_date, 'DD-MON-YY HH24:MM:SS') TIMESTAMP, job_name, job_class, operation, status FROM USER_SCHEDULER_JOB_LOG WHERE job_name = 'JOB2' ORDER BY log_date;TIMESTAMP JOB_NAME JOB_CLASS JOB STATUS-------------------- ------------------ ---------- ---------- - --------18-DEC-07 23:10:56 CREATE TASK 2 GRADE 118-DEC-07 23:12:01 GRADE 1 ASSIGNMENT 2 UPDATE18-DEC-07 23:12:31 ASSIGNMENT 2 VERSION CLASS 118-DEC-07 23:12:41 TASK 2 GRADE 1 SUCCESSFUL18-DEC-07 23:13:12 RELEASE TASK 2 GRADE 118-DEC-07 23:13:18 JOB 2 STOPPED18-DEC-07 23:19:36 ASSIGNMENT 2 GRADE 1 REMOVAL
Logging level | Description |
---|---|
|
No, it won’t be saved. |
|
The tree is only written if the command fails. |
|
All the details of executing the scheduler task select * from ALL_SCHEDULER_JOB_RUN_DETAILS – you can monitor DBA scheduler thread jobs as follows. select * from dba_scheduler_running_jobs; You can track the details of the dba scheduler connection job as follows. Audit record is created for each task execution period. |
|
A log entry is generated almost every time a task is run, and every operation performed during execution, including creating, enabling/disabling, updating (with SELECT job_name, session_id, running_instance, elapsed_time, cpu_used FROM dba_scheduler_running_jobs; In addition, the following view is used to get information about the history of a running task. |